
Last C_TS422_2023 practice test reviews: Practice Test SAP dumps
Try C_TS422_2023 Free Now! Real Exam Question Answers Updated [Mar 23, 2026]
NEW QUESTION # 37
You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question.
- A. Create by order release
- B. Create in Kanban process
- C. Create without material
- D. Convert a purchase requisition
Answer: B,C
Explanation:
In SAP S/4HANA, production orders can be created using various methods depending on the business scenario:
* Create without material(B): Using transaction CO07, you can create a production order without referencing a material master. This is useful for one-off production (e.g., rework or testing) where no standard material is involved, requiring manual entry of components and operations.
* Create in Kanban process(D): In a Kanban-controlled environment (configured via PKMC), a production order can be created automatically when a Kanban bin is set to "Empty." The system uses the production supply area and control cycle to generate the order (e.g., order type PP01), supporting lean manufacturing.
Convert a purchase requisition(A) applies to procurement, not production order creation-planned orders from MRP are converted (CO40/CO41), not purchase requisitions.Create by order release(C) is not a method-release is a subsequent step (CO02), not a creation process. This aligns with SAP's production order creation options.
NEW QUESTION # 38
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the alert profile to the overall profile.
- B. Create an object selection variant for productionplanningrelated alerts.
- C. Create an object selection variant for alerts according to the priority of ATP categories.
- D. Assign the overall profile to the authorization profile.
Answer: A,B
NEW QUESTION # 39
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with more than one work center
- B. A production line with prioritized alternative work centers
- C. A production line with a parallel sequence in the routing
- D. A production line with an alternative sequence in the routing
Answer: A
Explanation:
In SAP S/4HANA repetitive manufacturing, aline hierarchy(transaction LDM1) organizes production lines for planning and execution:
* A production line with more than one work center(A): A line hierarchy represents a complex production line comprising multiple work centers (defined in CR01/CR02) linked in a hierarchical structure. For example, a main line (top node) might include sub-lines or work centers (e.g., assembly, testing), allowing detailed capacity planning and quantity assignment in MF50 or PP/DS.
Alternative sequence in the routing(B) (CA21, Alternative Sequence) defines optional operation paths, not a line hierarchy.Parallel sequence in the routing(C) (Parallel Sequence) splits operations concurrently, unrelated to line hierarchy structure.Prioritized alternative work centers(D) is managed via production versions or PP/DS mode selection, not line hierarchies, which focus on physical line organization. This is per SAP's REM line hierarchy definition.
NEW QUESTION # 40
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
Note: There are 2 correct answers to this question.
- A. Neighboring operations can be moved in both directions in order to create a slot.
- B. Changes are automatically implemented in the complete collective order.
- C. Scheduling of an operation takes place as close as possible to the desired date.
- D. Sequencing on multiactivity resources is automatically updated.
Answer: B,C
NEW QUESTION # 41
Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Variablesize item
- B. WBS item
- C. Preliminary item
- D. Work item
Answer: A,C
NEW QUESTION # 42
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.
- A. Use batch determination.
- B. Use the batch where-used list.
- C. Use batch derivation.
- D. Use the Batch Information Cockpit.
Answer: B,D
Explanation:
In SAP S/4HANA, when a raw material batch has a quality deviation and has been used in production, you can trace its impact on finished goods using batch management tools:
* Use the Batch Information Cockpit(B): The Batch Information Cockpit (transaction BMBC) provides a centralized view of batch data, including where-used information. By entering the raw material batch number, you can trace its usage through production orders (e.g., CO03) to identify all affected finished goods batches in stock (e.g., via the "Batch Usage" tab).
* Use the batch where-used list(C): The batch where-used list (transaction MB56 or embedded in MSC2N, "Batch Usage" function) tracks a batch's consumption across production orders or material movements (e.g., goods issue 261). It shows the hierarchy from the raw material batch to finished goods batches, pinpointing affected stock (e.g., in MMBE).
Batch determination(A) (e.g., in COB1) is for selecting batches during production or sales, not tracing past usage.Batch derivation(D) (Customizing, Logistics - General > Batch Management > Derivation) transfers batch attributes from raw to finished goods but doesn't identify affected stock retrospectively-it's a forward process. This is per SAP's batch traceability features.
NEW QUESTION # 43
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Defining the relevant work centers in the routing
- B. Activating the reporting point backflush in the order dependent parameters
- C. Activating the reporting point backflush in the work centers
- D. Defining the operations as reporting points using the control key
Answer: D
NEW QUESTION # 44
Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.
- A. Check material availability.
- B. Define integration with cost accounting.
- C. Schedule production orders.
- D. Select master data.
Answer: B,D
NEW QUESTION # 45
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question
- A. Teardown time
- B. Queue
- C. Setup Time
- D. Move time
Answer: A,C
Explanation:
The time element of midpoint scheduled operations that can be reduced by reduction strategy settings while dispatching are teardown time and setup time. Teardown time is the time required to dismantle the production equipment after the operation is completed. Setup time is the time required to prepare the production equipment before the operation is started. Both teardown time and setup time can be influenced by the reduction strategy settings, which define the percentage of reduction and the minimum duration for each time element. The reduction strategy settings can be maintained in the work center or the routing. The system applies the reduction strategy settings when dispatching the operations to the resources in the planning board or the product view. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 32; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 81.
NEW QUESTION # 46
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.
- A. Neighboring operations can be moved in both directions in order to create a slot.
- B. Changes are automatically implemented in the complete collective order.
- C. Scheduling of an operation takes place as close as possible to the desired date.
- D. Sequencing on multiactivity resources is automatically updated.
Answer: B,C
NEW QUESTION # 47
What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Create new production quantities.
- B. Reschedule deallocate operations.
- C. Dispatch operations to work centers.
- D. Change the assignments of production quantities to production lines.
Answer: B,D
NEW QUESTION # 48
What are the key features of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the use of subitems inside material BOM (bill of material)
- B. To determine how costs are rolled up by product costing
- C. To determine the sequence in which materials are planned in MRP
- D. To determine the priority of alternative components inside ATP
Answer: B,C
NEW QUESTION # 49
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.
- A. Customers can use the dashboard in the dev, test, and production tenants.
- B. It can be accessed by using SAP For Me.
- C. Customers can grant access to the dashboard to partners.
- D. It can be used in all SAP S/4HANA Cloud editions.
Answer: B,C
Explanation:
TheClean Core Dashboardin SAP S/4HANA Cloud Private Edition provides insights into system health, customization levels, and adherence to clean core principles. Its features include:
* Customers can grant access to the dashboard to partners(A): SAP allows customers to share dashboard access with implementation partners (e.g., via user management in SAP Cloud ALM or SAP For Me), facilitating collaboration on clean core compliance and optimization.
* It can be accessed by using SAP For Me(C): The dashboard is integrated into the SAP For Me portal (https://me.sap.com), a customer-facing interface providing system analytics, including clean core metrics (e.g., custom object usage), accessible with appropriate credentials.
Use in dev, test, and production tenants(B) is inaccurate-the dashboard typically reflects the production system's state, with development and test monitored separately (e.g., via SAP Cloud ALM).Use in all SAP S
/4HANA Cloud editions(D) is incorrect-clean core features are tailored to Cloud Private Edition, with variations in Public Cloud or on-premise editions. This is per SAP's clean core tools documentation.
NEW QUESTION # 50
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question
- A. WBS item
- B. Work item
- C. Variable-size item
- D. Non-stock item
Answer: C,D
Explanation:
You can select the following standard item categories inside a bill of material (BOM):
Variable-size item: This item category is used for materials that have variable dimensions, such as pipes, wires, or fabrics. The system calculates the quantity of the variable-size item based on the formula and the dimensions entered in the BOM. You can also use the variable-size item to define a scrap percentage for the material.
Non-stock item: This item category is used for materials that are not managed in inventory, such as consumables, services, or subcontracting items. The system does not create any reservations or stock movements for the non-stock item. You can use the non-stock item to trigger purchasing requisitions or purchase orders for the material. Reference: Bill of Material Item Category; Bills of Material in Production Planning
NEW QUESTION # 51
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
- A. Use a propagation range.
- B. Use a planning area.
- C. Use a resource group
- D. Use a planning group.
Answer: C
Explanation:
You can achieve planning only for specific resources in Advanced Planning (PP/DS) by using a resource group. A resource group is a collection of resources that share the same characteristics and can be used interchangeably for production. You can assign a resource group to a product or a production version, and then use the resource group as a selection criterion in the planning board or the product view. This way, you can restrict the planning to only those resources that belong to the resource group. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 25; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 79.
NEW QUESTION # 52
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure.
- B. Fill up to the maximum stock level.
- C. Fill up to the safety stock level.
- D. Fill up to the reorder stock level.
Answer: A
Explanation:
In reorder point planning, the system compares the available stock with the reorder point to determine the net requirements. If the available stock falls below the reorder point, the system triggers a procurement proposal for the material. The quantity of the procurement proposal depends on the lot size procedure that is defined in the material master. The lot size procedure determines how the system calculates the order quantity based on factors such as demand, costs, and storage space. There are different types of lot size procedures, such as static, periodic, or optimum lot size. Reference: [Production Planning with SAP S/4HANA], page 156; [SAP Help Portal: Lot Size Calculation].
NEW QUESTION # 53
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the alert profile to the overall profile.
- B. Assign the overall profile to the authorization profile.
- C. Create an object selection variant for priority-category-related alerts.
- D. Create an object selection variant for production-planning-related alerts.
Answer: A,B
Explanation:
The alert monitor in Advanced Planning allows you to monitor and analyze the planning situation and identify any problems or deviations from the desired state. To use the alert monitor, you need to configure the following elements:
Overall profile: This defines the scope and content of the alert monitor, such as the planning objects, the alert types, the alert categories, and the alert levels. You can assign one or more alert profiles to an overall profile to specify the alerts that you want to monitor.
Alert profile: This defines the criteria and parameters for generating alerts, such as the time horizon, the planning version, the planning mode, and the alert threshold. You can create different alert profiles for different planning scenarios or objectives.
Authorization profile: This defines the access rights and restrictions for the alert monitor, such as the planning objects, the locations, the products, and the resources that a user can view or edit. You can assign an overall profile to an authorization profile to control which alerts a user can see or process.
Therefore, to set up the alert monitor, you need to assign the alert profile to the overall profile (B) and assign the overall profile to the authorization profile (D). Creating an object selection variant for priority-category-related alerts (A) or production-planning-related alerts (C) is not a configuration step, but a selection option in the alert monitor to filter the alerts by different criteria. Reference:
NEW QUESTION # 54
Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
- A. Use a propagation range.
- B. Use a planning area.
- C. Use a resource group.
- D. Use a planning group.
Answer: C
NEW QUESTION # 55
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?
Note: There are 2 Correct answers to this question?
- A. Run PP/DS heuristic for repetitive manufacturing
- B. Assign planned orders manually in the planning table
- C. Run MRP with quota arrangement
- D. Assign planned orders manually in the planning table
Answer: A,D
Explanation:
Run PP/DS heuristic for repetitive manufacturing: PP/DS (Production Planning and Detailed Scheduling) is a component of SAP S/4HANA that provides advanced planning and scheduling functions for complex production scenarios. You can run the PP/DS heuristic for repetitive manufacturing to automatically assign planned orders to production lines based on the available capacity, material, and sequence constraints. The PP/DS heuristic also optimizes the line utilization and minimizes the setup times and costs.
Assign planned orders manually in the planning table: The planning table is a graphical tool that allows you to view and manipulate the production plan for repetitive manufacturing. You can assign planned orders manually to production lines by dragging and dropping them in the planning table. You can also adjust the start and finish dates, quantities, and sequences of the planned orders. The planning table shows the capacity situation and the material availability for each production line.
You cannot plan both quantities and capacities during line loading in repetitive manufacturing by using the following options:
Run MRP with quota arrangement: MRP (Material Requirements Planning) is a process that calculates the quantity and timing of material requirements based on the demand and supply situation. You can run MRP with quota arrangement to distribute the total requirements for a material among multiple sources of supply, such as vendors, plants, or production lines. However, MRP does not consider the capacity constraints or the sequence dependencies of the production lines, and therefore cannot plan the capacities during line loading.
Assign planned orders manually in the planning table: This option is identical to option C and therefore cannot be a correct answer.
NEW QUESTION # 56
During production order creation several valid production versions are found. How does the system choose the production version?
- A. Validity period or sales order
- B. Planned order or material number
- C. Alphanumeric or quota arrangement
- D. Lot size or material cost
Answer: C
NEW QUESTION # 57
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Quantity
- B. Scrap percentage
- C. Installation point
- D. Item type
Answer: A,B
Explanation:
The subitems of a bill of material (BOM) are the components that make up the product or assembly. You can maintain the following data for each subitem:
Quantity: This is the number of units of the component that are required for one unit of the product or assembly. You can specify the quantity in different units of measure, such as base unit, order unit, or alternative unit. You can also use variable quantities, such as percentages or formulas, to calculate the quantity dynamically based on the product or assembly characteristics.
Scrap percentage: This is the percentage of the component that is expected to be wasted or lost during the production or assembly process. You can specify the scrap percentage for each component to adjust the quantity accordingly. For example, if the quantity of a component is 10 and the scrap percentage is 5%, the system will increase the quantity by 0.5 to account for the scrap.
The installation point (A) and the item type (B) are not data that you can maintain in the subitems of a BOM. The installation point is a field in the equipment master record that indicates where the equipment is installed. The item type is a field in the sales document item that determines the processing and pricing of the item. These fields are not relevant for the BOM subitems. Reference:
https://sapstack.com/pp/bom-in-sap-bill-of-material/
https://skillstek.com/bill-of-material-in-sap/
NEW QUESTION # 58
......
Get Ready to Pass the C_TS422_2023 exam with SAP Latest Practice Exam : https://pdfpractice.actual4dumps.com/C_TS422_2023-study-material.html