NEW QUESTION # 75
Color used for temp survey markings, unknown or unidentified facilities.

  • A. Pink
  • B. Yellow
  • C. Blue
  • D. Green

Answer: B


NEW QUESTION # 76
Hazard recognition by inspector -Hazard recognition by inspector -flooding, wind, dust, fires

  • A. Calibration
  • B. Economic
  • C. Social
  • D. Environmental

Answer: B


NEW QUESTION # 77
What standard covers strength test requirements for steel pipe to operate at hoop stress of more than 30% of SMYS.

  • A. 49 Cfr 202.505
  • B. 72/smys
  • C. 49 CFR 192.505
  • D. 3192.233

Answer: B


NEW QUESTION # 78
ACI

  • A. Concrete Reinforcing Steel Institute
  • B. Horizontal Directional Drilling
  • C. Common Ground Alliance
  • D. American Concrete Institute

Answer: D


NEW QUESTION # 79
Define specification in terms related to data information and document

  • A. Lifting/hoisting pipe and equipment, excavation your pipe lines or other utilities, marking/labeling, and other programs to increase awareness
  • B. Data supporting the existence of verity of something(Objective evidence can be obtained through observation measurement test or by other means)(ISO 9000 3.8.3)
  • C. Within 2 feet of the existing facilities or the distance mandated by state law which ever is greater(INGAA CROSSING guide 11 K)
  • D. Document stating requirements(example quality manual, quality plan, technical drawing, procedure document, work instruction.)(ISO 9000 3.8.7)

Answer: C


NEW QUESTION # 80
Identifying _______________ needs in all areas is a responsibility of the environmental inspector.

  • A. noxious weeds and soil pests
  • B. erosion/sediment control and soil
  • C. temporary erosion control.
  • D. design validation

Answer: B


NEW QUESTION # 81
The major classes or respirators are?

  • A. Atmosphere supplying, air purifying and self contained aparatus
  • B. 49 CFR 192.309
  • C. Site Specific test procedure
  • D. The entire weld must be cut out.

Answer: B


NEW QUESTION # 82
Where should emergency information for chemicals in substances be located?

  • A. Within a set of written process safety information controls(29 CFR 1910.119, general knowledge)
  • B. Lifting/hoisting pipe and equipment, excavation your pipe lines or other utilities, marking/labeling, and other programs to increase awareness
  • C. Set of interrelated activities that use inputs to deliver an intended result(ISO 9000 3.4.1)
  • D. OSHA 1926.650 and 1926.651, (29 CFR 1926) safety and health regulations for construction

Answer: A


NEW QUESTION # 83
What are examples of permissible protective screens per ANSI?

  • A. flotation
  • B. the system power source
  • C. climatic and other work condition hazards
  • D. radiation-protective, semitransparent materials

Answer: B


NEW QUESTION # 84
Define Owner

  • A. An individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and Industry practises are being met safely, effectively, and in an environmentally sound manner.
  • B. Is the vertical separation between the existing pipeline and facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24"). The minimum distance is one foot (12"). The new pipeline should be installed at a level depth across the ROW, if practicable.
  • C. Is the singular point of contact identified within the company of the crossing company and the owner who has the responsibility to communicate about the safely managed crossing. There will be a cross and Company designated contact and an owner designated contact.
  • D. Is the entity that owns our operates the existing pipeline facilities. The owner may designate a third-party or parties to perform the tasks necessary to enable a safe crossing of its facilities by crossing company but remains responsible for the work performed by such third-party.

Answer: D


NEW QUESTION # 85
What do you do with parts missing an MTR

  • A. Materials and material handling
  • B. Segregate and have inspected
  • C. Sediment barriers
  • D. Clearing

Answer: B


NEW QUESTION # 86
as the angle of the sling on pipe ends increases, the tension on pipe ___________?

  • A. calibration
  • B. cannot
  • C. increases
  • D. decreases

Answer: A


NEW QUESTION # 87
If the pressure changes in a pipe section, what other change is directly related to this pressure change?
-stress
-volume
-Temp
-Weight

  • A. Volume
  • B. Flotation
  • C. Synthetic
  • D. Pressure

Answer: D


NEW QUESTION # 88
How often are inspectors required to inspect temporary Rosian control measures?

  • A. 2 to 3 kilometres(CEPA 16.1)
  • B. Within 24 hours of each 0.50 inch of rainfall(FERC Upland 11.B.13)
  • C. Barred or curled
  • D. a) an operator digging a trench for excavation of foreign utilities

Answer: D


NEW QUESTION # 89
The following should be available during which portion of pipe install?
-Mobile light plants
-Emergency spill kit
-Ladders
-Whip checks
-Fire extinguisher
-Warning signs and barricades

  • A. Liquid penetrant
  • B. Pressure testing
  • C. Calibration
  • D. Ultrasonic testing

Answer: B


NEW QUESTION # 90
The quality management system documentation shall include?

  • A. Statements of policy and objectives(API Spec Q1 4.4.1)
  • B. Process of establishing, documenting, implementing, maintaining and continually improving a quality management system.(ISO 9000 3.4.3)
  • C. Management system set of interrelated or interacting elements of an organization to establish policies and objectives and processes to achieve those objectives.(ISO 9000 3.5.4)
  • D. Person or group of people who directs and controls an organization at the highest level(ISO 9000 3.1.1)

Answer: A


NEW QUESTION # 91
Perform these before any mechanical ground disturbance

  • A. Pressure testing
  • B. Impressed current
  • C. Sweep locate, pot hole, one call
  • D. Identifying, documenting and oversee activity

Answer: C


NEW QUESTION # 92
Soil is in condition where cave-in is imminent or is likely to occur. Evidence by fissures, slumps or loose material rolling down.

  • A. Distress
  • B. Stressors
  • C. Eustress
  • D. Urgency

Answer: D


NEW QUESTION # 93
Soil that remains in clumps

  • A. Adhesive
  • B. Granular
  • C. Cohesive
  • D. Cohesionless

Answer: C


NEW QUESTION # 94
PHMSA

  • A. Pipeline Hazardous Materials and Safety Administration
  • B. Occupational Safety and Hazard Administration
  • C. Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund
  • D. Interstate Natural Gas Association of America

Answer: A


NEW QUESTION # 95
Internal and external corrosion threats are typically managed by what type of pressure test?

  • A. Within a set of written process safety information controls(29 CFR 1910.119, general knowledge)
  • B. That the trench is adequately sloped, and access/egress ladders are installed.(CEPA TABLE 74)
  • C. A spike test, strength test and/or a leak test(API 1110, 4.1.3 a)
  • D. A right of way(INGaA Crossing Guideline 11 M)

Answer: C


NEW QUESTION # 96
Root bead segments used in connection with external clamps should be uniformly spaced around the circumference of the pipe and shall have an aggregate length of at least ____________ of the pipe circumference before the clamp is removed?

  • A. notify the owner(api 1169, 6.7)
  • B. 50%(API 1104 7.3)
  • C. 50%(api 1094 7.3)
  • D. rework(api 1104 3.1.25)

Answer: B


NEW QUESTION # 97
Casing protecting a transmission line under a rail road must withstand________.

  • A. Pressure Testing
  • B. Impressed Current
  • C. Superimposed Loads
  • D. Stress Corrosion Cracking

Answer: C


NEW QUESTION # 98
CERCLA purpose

  • A. Regulation Transportation of Natural and Other Gas by Pipeline
  • B. To remedy threats to human health and the environment from unexpected releases and historical mistakes in hazardous waste management
  • C. Area within 24" of facilities or the distance mandated by state law, whichever is greater. NOTE: CGA & INGAA says 18".
  • D. Noise level exceeds 85 dba over an 8 hour period. INGAA states during pressure testing to keep under 80 dba,s

Answer: A