NEW QUESTION # 10
Your customer has a requirement to import and process third-party transactions that are "costed" and
"accounted".
Which configuration option needs to be set satisfy the requirement? (Choose the best answer.)

  • A. Document Entry Options
  • B. Import Options
  • C. Transaction Source Options
  • D. Document Options

Answer: C

Explanation:
Reference https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJC/F1071488AN1004C.htm To import and process third-party transactions that are costed and accounted, you need to set the Transaction Source Options for the transaction source that you use to import the transactions. The Transaction Source Options allow you to specify whether the transactions are costed and accounted by the source system or by Oracle Fusion Cost Management. You can also specify whether to validate and transfer costs and accounting entries to projects and general ledger. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/manage-project-costs.html#OAPFM2355941


NEW QUESTION # 11
Your customer wants to assign the Net 45 payment term to all sets except for the corporate business unit specific set, which is assigned the Net 15 payment term. At transaction entry, the list of values for payment terms consists of only one set of data: the set that is assigned to the transaction's business unit.
Which reference data sharing method would you set up to meet the customer requirement? (Choose the best answer.)

  • A. assignment to multiple sets; common values allowed
  • B. assignment to one set only with common values
  • C. assignment to one set only; no common values allowed
  • D. assignment to multiple sets; no common values allowed

Answer: D

Explanation:
Reference https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-enterprise-structures.
html#FACIA462453
Reference Data Sharing Methods
Variations exist in the methods used to share data in reference data sets across different types of objects. The following list identifies the methods:
Assignment to one set only, no common values allowed. This method is the simplest form of sharing reference data that allows assigning a reference data object instance to one and only one set. For example, Asset Prorate Conventions are defined and assigned to only one reference data set. This set can be shared across multiple asset books, but all the values are contained only in this one set.
Assignment to one set only, with common values. This method is the most commonly used method of sharing reference data that allows defining reference data object instance across all sets. For example, Receivables Transaction Types are assigned to a common set that is available to all the business units. You need not explicitly assign the transaction types to each business unit. In addition, you can assign a business unit-specific set of transaction types. At transaction entry, the list of values for transaction types includes the following:
Transaction types from the set assigned to the business unit.
Transaction types assigned to the common set that is shared across all business units.
Assignment to multiple sets, no common values allowed. The method of sharing reference data that allows a reference data object instance to be assigned to multiple sets. For instance, Payables Payment Terms use this method. It means that each payment term can be assigned to one or more than one set. For example, you assign the payment term Net 30 to several sets but assign Net 15 to a set specific only to your business unit.
At transaction entry, the list of values for payment terms consists of only the set that is assigned to the transaction's business unit.
Note: Oracle Fusion Applications contains a reference data set called Enterprise. Define any reference data that affects your entire enterprise in this set. Also update the data set going forward as you create new reference data items.


NEW QUESTION # 12
Which setup option is common to both financial and project plan types?

  • A. Enable the entry of plan amounts in currencies other than the project currency.
  • B. Identify whether the plan type is the default selection when you create budget or forecast versions.
  • C. Enable the use of a workflow for managing budget or forecasting status changes.
  • D. Manage the options for creating control budgets in Oracle Fusion Budgetary Control.

Answer: A

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-control- configuration-manage-financial-and-project-plan-types.html#OAPFM75315 Financial and Project Plan Setup Options The following table describes the basic budget, forecast, or project plan setup options that determine how a plan type is used in the context of a project. Except for third-party scheduling, you can't edit these options at the project level.
Option
Location
Description
Planning amounts
Financial plan type
Indicates that the financial plan type supports the creation of versions with the following amounts:
* Cost amounts
* Revenue amounts
* Both cost and revenue amounts
* Either cost or revenue amounts
Approved budget or primary forecast
Financial plan type
Determines whether a financial plan type is used for creating approved budget versions or primary forecast versions that are used for plan comparison or project performance reporting.
Default financial plan type
Financial plan type
Determines whether the financial plan type is the default selection when you create budget or forecast versions.
Workflows
Financial plan type
Enables the use of a workflow for managing budget or forecast status changes.
Third-party scheduling software
Project plan type
Indicates whether project planning is performed in Microsoft Project.
If third-party scheduling is disabled in the project plan type, you can use the associated project or project template to create a project in Microsoft Project. However, you can't export the new project or link it to one created in Oracle Fusion Project Portfolio Management.
Multiple transaction currencies
Financial and project plan type
Enables entry of plan amounts in currencies other than the project currency.
Budgetary control settings
Financial plan type
Manages options for creating control budgets in Oracle Fusion Budgetary Control.


NEW QUESTION # 13
Your company uses an accounting calendar with periods that are identical to calendar months. A contract resource has been identified to work for six months on an accounting close cycle project. The resource is planned to start with 10 days left in the first period and to end 20 days into the last period. For the remaining periods, the resource must be loaded on all working days of the month. You are required to distribute the budget, forecast, and planning amounts across periods based on the task duration.
Which predefined spread curve must be used to meet this requirement? (Choose the best answer.)

  • A. Daily Spread Basis
  • B. S-Curve
  • C. Back Loaded
  • D. Bell Curve
  • E. Even

Answer: A

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-control- configuration-manage-spread-curves.html#OAPFM79760 Predefined Spread Curves Name Description Dist. Factors Even Linear distribution of financial or project plan values across periods.
10-10-10-10-10-10-10-10-10-10
Prorated Even
Linear distribution of financial or project plan values across periods, with an exception of the first period and last period in the financial plan. Financial or project plan values for the first period and last period are prorated based on the number of days in the period.
10-10-10-10-10-10-10-10-10-10
Back Loaded
Back-loaded distribution of financial or project plan values across periods. Assigned amounts increase over succeeding periods.
0-5-10-15-20-25-30-35-40-45
Front Loaded
Front-loaded distribution of financial or project plan values across periods. Assigned amounts decrease over succeeding periods.
45-40-35-30-25-20-15-10-5-0
S Curve
S-shaped distribution of financial or project plan values across periods.
18-10-8-10-15-17-18-17-15-8
Bell Curve
Bell-shaped distribution of financial or project plan values across periods. Assignment of plan values is highest in the middle periods.
0-4-10-12-14-12-10-4-0-0
Daily Spread Analysis
Spread is based upon the number of days in each financial period throughout the duration of the task assignment. Amounts are proportionally distributed throughout all periods for the duration of the task assignment None


NEW QUESTION # 14
Your customer has implemented Oracle Project Portfolio Management Cloud recently and they have hired new employees for their Professions Services business. These employees are set up in Oracle Human Capital Management Cloud, but the Project Administrators are unable to add them as resources in the Planning Resource Breakdown Structure.
What are three conditions for new employees to show up in the list? (Choose three.)

  • A. All new employees created as persons must have an active project role.
  • B. Current date is before the effective date of the resource, and you did not enable the "Include people with future-dated effective start dates" option during the search.
  • C. All new employees created as persons must be assigned to a department.
  • D. All new employees created as persons must have an active supervisor.
  • E. All new employees created as persons must have an active assignment.

Answer: B,C,E

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation- configuration-define-project-resource-breakdown-structures.html#OAPFM180158_2 Why can't I find persons in the list of resources when I enter team members, planning resources, or person rate schedules?
You can't find persons in the list of resources when you enter team members, planning resources, or person rate schedules in the following situations:
* The administrator didn't assign a department while creating users. Persons must have an active assignment and be assigned to a department in Oracle Fusion Human Capital Management before they can be added as team members or entered as resources on the planning resource breakdown structure or person rate schedule.
* The resource isn't active in Oracle Fusion Human Capital Management because the current date is before the effective date of the resource. If you want to include persons who will start in the future, select the Include people with future-dated effective start dates option when you search for the person.
* Persons assigned as project managers aren't active as of the project start date.
* The assignment of the person is terminated, and an appropriate value isn't set for the number of days to display people with terminated assignments. You can set the profile value appropriately at the site profile level using the Specify Number of Days to Display People with Terminated Assignments task in the Setup and Maintenance work area.


NEW QUESTION # 15
You have closed the project accounting period with a warning, but you are unable to close the accounting period due to an error.
Identify two reasons for this problem. (Choose two.)

  • A. Unaccounted transactions have not been swept to the next period.
  • B. The corresponding Oracle Payables Cloud accounting period has not been closed.
  • C. Transactions entered in an integrated Oracle Cloud Application are accounted, but not yet transferred and imported into Oracle Project Portfolio Management Cloud.
  • D. Unaccounted transactions are not imported.
  • E. Pending burden summarization items have not been processed.

Answer: A,C

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjb/record-accounting-for- project-billing.html#OAPJB340382 Topic - Accounting Period and Project Accounting Period Closing: How Validation Works


NEW QUESTION # 16
Your customer has separate organizations to maintain indirect, capital, and billing types of projects.
Identify the two setups that can be used to fulfill this requirement. (Choose two.)

  • A. Project Accounting Business Function
  • B. Organization Tree
  • C. Project Type
  • D. Business Unit
  • E. Project Organization Classification

Answer: B,E


NEW QUESTION # 17
In your customer site, the capitalized interest calculation is implemented on their project types. Which option represents the costs considered in the interest calculation? (Choose the best answer.)

  • A. common costs on the project/task
  • B. expenditure type exclusions on the Capitalized Interest rate name
  • C. expenditure type exclusions on the Capitalized Interest rate schedules
  • D. expenditure items whose cost spreads across multiple assets that are capitalized
  • E. expenditure items whose costs are applied to a single asset or multiple assets

Answer: E

Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic
/TopicId_P_988B43C997365159E040D30A68813832
https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125377AN61D92.htm


NEW QUESTION # 18
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation? (Choose two.)

  • A. Manage Project Plan Resource Assignment
  • B. Allocate Project Expense
  • C. Transfer Project
  • D. View Project Progress

Answer: A,D

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjm/index.html#_Toc468200732_1_12
Topic - Privileges - This table lists privileges granted to duties of the abstract role Project Management Duty.
Granted Role - Project Plan Management
Privilege - only A and C are listed


NEW QUESTION # 19
You have been hired as a project manager for implementing the Project Financial Management and Project Execution Management offering by an organization. The Chief Information Officer of the deploying organization has requested you to explain the benefits of using the implementation project-based approach over the functional area-based approach.
Which two are the main benefits of using the implementation projects within Functional Setup Manager?
(Choose two.)

  • A. Implementation Project helps in assigning responsibility of managing setup data to a broad group of users.
  • B. Implementation Project gives you the flexibility to set up different functional areas of the offering at different times.
  • C. Implementation Project helps you to use the manage setup data entry in bulk option.
  • D. Implementation Project helps you to monitor progress of the setup tasks.

Answer: A,D

Explanation:
Some of the main benefits of using the implementation projects within Functional Setup Manager are:
* Implementation Project helps in assigning responsibility of managing setup data to a broad group of users. You can assign tasks to different users who are responsible for entering and validating setup data for different functional areas of the offering.
* Implementation Project helps you to monitor progress of the setup tasks. You can track the status and completion percentage of each task and view the dependencies and prerequisites among tasks.
Implementation Project does not give you the flexibility to set up different functional areas of the offering at different times, as this is determined by the configuration package that you select for your implementation. Implementation Project does not help you to use the manage setup data entry in bulk option, as this is a separate feature that allows you to import and export setup data across instances using spreadsheets. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c
/oapfm/implement-project-financial-management-applications.html#OAPFM2356051


NEW QUESTION # 20
You are trying to create a custom infolet but are not able to find the "Create Infolet" option in the Infolet repository window. Which two steps should be completed before you can access the "Create Infolet" option?

  • A. You should be on the Project Custom Objects page.
  • B. You must activate Page Composer.
  • C. You should enable the "Create Infolet" option from the Personalize Springboard page.
  • D. You must be in an active sandbox.

Answer: B,D

Explanation:
Ref: https://docs.oracle.com/cd/E83857_01/saas/applications-common/18b/oaext/page-modification.
html#OAEXT1640891


NEW QUESTION # 21
You have defined two expenditure types, but they are not available for selection when you enter an expenditure batch. Identify the reason for this problem. (Choose the best answer.)

  • A. The two expenditure types are not assigned to the reference data set that is assigned to the project expenditure organization in which the transaction is performed.
  • B. The two expenditure types are not assigned to the reference data set that is assigned to the project- owning organization in which the transaction is performed.
  • C. The two expenditure types are not assigned to the reference data set that is assigned to the project unit in which the transaction is performed.
  • D. The two expenditure types are not assigned to the reference data set that is assigned to the business unit in which the transaction is performed.

Answer: C

Explanation:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf (19A Part # F11256-01) Chapter 3 - Define Project Organizations Topic - Set Assignments and Project Data - How They Work Together (Page 29) Business Unit as Set Determinant Business units enable you to control and report on financial transactions, usually for specific geographical entities within the enterprise. For project management purposes, assign the Project Accounting business function to the business unit.
Business unit is a set determinant for the project-related reference data objects described in the following table.
Ref Data Object
Entities
Project Accounting Definition
Project Types
Project Rates
Project rate schedules
Project Unit as Set Determinant
Use project units to enforce consistent project management practices across your enterprise. Project unit is a set determinant for the reference data objects described in the following table.
Ref Data Object
Entities
Project Definition
Class codes, financial plan types, project plan types and project roles Project Transaction Types Expenditure types and work types You can only select class codes, plan types, roles, expenditure types and work types that are assigned to the same set as the project unit. To enable expenditure types and work types for use on projects owned by a project unit, assign the set associated with the Project Transaction Types reference data object to those entities


NEW QUESTION # 22
Which two statements describe how the Resource Qualification Score is calculated?

  • A. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification with a proficiency that is lower or higher than specified.
  • B. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification.
  • C. An individual's score is 100% if the resource request has a qualification, but no proficiency is specified, and the resource has the qualification.
  • D. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency.

Answer: C,D

Explanation:
The Resource Qualification Score is a percentage that indicates how well an individual matches the qualifications required for a resource request. An individual's score is 100% if either of the following conditions are met:
* The resource request has a qualification, but no proficiency is specified, and the resource has the qualification. This means that any level of proficiency is acceptable for the qualification.
* The resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency. This means that the resource has the exact level of proficiency required for the qualification. An individual's score is not 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification or has a different level of proficiency than required. In this case, the score is calculated based on how close the resource's proficiency is to the required proficiency. Reference: https://docs.oracle.com/en/cloud/saas
/project-portfolio-management/20c/oapfm/manage-project-resources.html#OAPFM2356001


NEW QUESTION # 23
Which three Cost Collection Flexfield core attributes can be derived during import if not explicitly entered in a transaction document? (Choose three.)

  • A. Work Type
  • B. Billable Flag
  • C. Capitalizable Flag
  • D. Funding Source
  • E. Expenditure Type

Answer: B,C,E

Explanation:
The Cost Collection Flexfield is a descriptive flexfield that captures additional information about project costs. It has three core attributes that are required for every cost transaction: Billable Flag, Expenditure Type, and Capitalizable Flag. These attributes can be derived during import if not explicitly entered in a transaction document, based on various rules and sources such as expenditure type defaults, project type defaults, transaction source defaults, etc. Funding Source and Work Type are not core attributes of the Cost Collection Flexfield, but context-sensitive segments that can be optionally enabled for certain transaction sources or business units. These segments capture additional information about how the costs are funded or what type of work is performed. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm
/manage-project-costs.html#OAPFM2356141


NEW QUESTION # 24
Where is the Allow Override option for the Default Capitalized Interest Rate Schedule specified?

  • A. Manage Project Type page
  • B. Manage Capitalized Interest Rates page
  • C. Manage Project Plan Type page
  • D. Manage Capitalized Interest Rate Schedules page
  • E. Manage Expenditure Type page

Answer: A

Explanation:
The Allow Override option for the Default Capitalized Interest Rate Schedule is specified on the Manage Project Type page. This option allows you to override the default capitalized interest rate schedule for a project or task that uses the project type. The default capitalized interest rate schedule is used to calculate the capitalized interest amount for a project or task based on the interest rates and dates defined in the schedule.
Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project- costs.html#OAPFM2356031


NEW QUESTION # 25
Identify three correct statements about the integration of Primavera P6 Enterprise Project Portfolio Management and Oracle Project Portfolio Management Cloud. (Choose three.)

  • A. Billing events flow from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.
  • B. Project plans and progress flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
  • C. Summarized actual quantity and cost flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
  • D. Projects and task definitions flow from Oracle Project Portfolio Management Cloud to Primavera P6 Enterprise Project Portfolio Management.
  • E. Event completion flows from Primavera P6 Enterprise Project Portfolio Management to Oracle Project Portfolio Management Cloud.

Answer: C,D,E

Explanation:
Ref: https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125394AN6D254.htm Primavera P6 Enterprise Project Portfolio Management and Oracle Fusion Project Portfolio Management: How They Work Together Use Oracle Fusion Project Integration Gateway to integrate Oracle Fusion Project Portfolio Management with Primavera P6 Enterprise Project Portfolio Management. The integration enables project accountants, project billing specialists, and executives to centrally perform project costing, billing, accounting, and executive reporting tasks in Oracle Fusion Project Portfolio Management while enabling each project manager to perform detailed project planning and scheduling in Primavera P6 Enterprise Project Portfolio Management.
Oracle Fusion Project Integration Gateway ensures data security, integrity, and efficiency by defining a set framework in which data is exported from and imported into Oracle Fusion Project Portfolio Management.
The following table and diagram provide an overview of the flow of information.
Information Type
From Application
To Application
Global integration information
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Projects and task definition
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Summarized project actual quantity and cost
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Project plans and progress
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management
Billing events
Oracle Fusion Project Portfolio Management
Primavera P6 Enterprise Project Portfolio Management
Event completion
Primavera P6 Enterprise Project Portfolio Management
Oracle Fusion Project Portfolio Management


NEW QUESTION # 26
Identify the attribute of a project type that determines if expenditure items are billable, and the amount type to be used as the basis for transfer pricing. (Choose the best answer.)

  • A. cost type
  • B. work type
  • C. event type
  • D. expenditure type

Answer: B

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125361.htm#OAPFM1125277 (what's a work type?) In billing, you can use work types to classify work for the following purposes:
* To determine the default billable status of expenditure items.
* To classify cross-charge amounts into cost and revenue for cross-charge transactions.
Tip: To use work types to determine whether an expenditure item is billable you must set the profile option Work Type Derived for Expenditure Item to Yes.
When you create or import expenditure items, the default work type is inherited from the associated task.
Tasks, in turn, inherit work type values from parent tasks and ultimately from the project. Project types determine the default work type value for projects and project templates.


NEW QUESTION # 27
Your business user has created a purchase order (PO) that has the following attributes:
Accrue at Receipt = Yes
Matching Option = 2 way
Receipt Close Tolerance = 100%
After approval, the PO is closed for receiving without creating a receipt. An AP invoice is created by matching to the PO. The user now runs Create Accounting for Receiving Transactions and then the "Import and Process Cost transactions" ESS (Enterprise Scheduler Service) job using the Transaction Source parameter as "Oracle Payables". The user notices that there is no cost transferred to the projects. Identify two reasons for this problem. (Choose two.)

  • A. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to Yes, cost is transferred to projects only if there are accounted receipt lines.
  • B. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to Yes, cost is transferred to project by payables.
  • C. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to NO, cost is transferred to projects by receipt accounting.
  • D. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to YES, cost is transferred to projects by Cost Management and not by Payables.

Answer: A,D

Explanation:
When the Accrue at Receipt option is set to Yes on a PO, the cost of the items or services is accrued when they are received, not when they are invoiced. Therefore, the cost is transferred to projects by Cost Management and not by Payables. However, if the PO is closed for receiving without creating a receipt, there will be no accounted receipt lines and no cost will be transferred to projects. To transfer the cost to projects, you need to either create a receipt or reopen the PO for receiving. Reference: https://docs.oracle.com/en/cloud
/saas/project-portfolio-management/20c/oapfm/manage-project-costs.html#OAPFM2355855


NEW QUESTION # 28
Your customer wants additional project information for detailed account balance maintenance, reconciliation, and reporting. Identify the configuration in subledger accounting that can be set up to fulfill this requirement.
(Choose the best answer.)

  • A. Supporting References
  • B. Journal Rules
  • C. Accounting Rule
  • D. Accounting Method
  • E. Mapping Sets

Answer: A

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125357.htm#OAPFM1125357 Assignment of Supporting References Supporting references may be used to capture transaction values on journal entry lines. A supporting reference can be used on a journal entry rule set only if it's assigned a source from the event class of the journal entry rule set.
Creating Supporting References: Explained
Supporting references are used to store additional source information about a subledger journal entry at the line level.
Supporting references with balances establish subledger balances for a particular source and account for a particular combination of supporting references plus the account combination.
For example:
* If a journal line contains a supporting reference that includes two sources, Customer Type and Customer Name.
* Balances are created for the account combination, plus customer name and customer type.
Examples of how you may want to use supporting reference balances are to:
* Facilitate reconciliation back to the subledgers and source systems by tagging journal entries with transaction and reference attributes.
* Create balances by dimensions not captured in the chart of accounts.
* Reporting using dimensions not captured in the chart of accounts.
* Enrich Oracle Fusion Business Intelligence Applications reporting on subledger journals.
* Profit and loss balances by dimensions not captured in the chart of accounts Define supporting references to hold additional supporting information for detailed account balance maintenance or reconciliation and reporting requirements.


NEW QUESTION # 29
Your client has decided to import time cards into Project Costing from Oracle Fusion Time and Labor. They have a requirement to make adjustments to time card entries whenever needed.
In which work area will the employees and contingent workers be able to modify their time cards?

  • A. Time
  • B. Cost
  • C. Both Time and Cost
  • D. Asset

Answer: A

Explanation:
The employees and contingent workers will be able to modify their time cards in the Time work area. This work area allows them to enter, review, edit, and submit their time cards for approval. They can also view the status and history of their time cards and make corrections as needed. The Time and Cost work area allows the project managers and cost accountants to review, adjust, and transfer time card transactions to projects and tasks. The Asset work area allows the asset managers and cost accountants to review, adjust, and transfer asset transactions to Oracle Fusion Assets. These work areas are not used by the employees and contingent workers to modify their time cards. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c
/oapfm/manage-project-time-and-labor.html#OAPFM2356221


NEW QUESTION # 30
Your organization wants to capture the project details for work order labor and equipment resource transactions as part of a project-driven supply chain solution.
Which expenditure type class is recommended for the expenditure types that need to be defined for these type of transactions?

  • A. Supplier Invoice
  • B. Work In Process
  • C. Inventory
  • D. Usages

Answer: B

Explanation:
The expenditure type class that is recommended for the expenditure types that need to be defined for work order labor and equipment resource transactions is Work In Process. This class indicates that the transactions are related to work orders that are performed as part of a project-driven supply chain solution. This class also allows the transactions to be processed by Oracle Fusion Manufacturing applications and transferred to Oracle Fusion Project Costing applications. Supplier Invoice is not a valid expenditure type class for work order labor and equipment resource transactions. This class indicates that the transactions are related to supplier invoices that are entered in Oracle Fusion Payables applications and transferred to Oracle Fusion Project Costing applications. Usages is not a valid expenditure type class for work order labor and equipment resource transactions. This class indicates that the transactions are related to material usages that are entered in Oracle Fusion Inventory Management applications and transferred to Oracle Fusion Project Costing applications. Inventory is not a valid expenditure type class for work order labor and equipment resource transactions. This class indicates that the transactions are related to inventory movements that are entered in Oracle Fusion Inventory Management applications and transferred to Oracle Fusion Project Costing applications. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm
/manage-project-costs.html#OAPFM2356311


NEW QUESTION # 31
When scheduling the Update Project Performance Data process to run on a periodic basis, which summarization method would you select? (Choose the best answer.)

  • A. Incremental
  • B. Detail
  • C. Summary
  • D. Bulk

Answer: A

Explanation:
Reference https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/define-project- organizations.html#OAPFM177674 Settings That Affect Performance Data Summarization You can summarize performance data for a project unit, business unit, a range of projects, or projects managed by a project manager. When you run the Update Project Performance Data process from the Scheduled Processes page, select one of the summarization methods from the following table:
Summarization Method
Usage
Incremental
Summarizes new transactions that are yet to be summarized
Delete and re-summarize
Correct summary data when the source system data changes outside the regular transaction flow.
Do not use this summarization method when you run the Update Project Performance Data Without Producing Report process unless you are advised to do so.
Resource breakdown structure
Migrate all summary data from one resource breakdown structure version to the next.
If you select this option, you must also specify the resource breakdown structure header.


NEW QUESTION # 32
You are set up as a Follower in Manage Tasks. Which two abilities can you accomplish? (Choose two.)

  • A. Receive email notifications about changes that team members make to a task.
  • B. Enter progress for tasks.
  • C. View task details and the task activity stream.
  • D. Edit task details.

Answer: A,C

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/execute-project-tasks- and-deliverables.html#OAPEM1122082 Followers are persons who aren't working on the task but have an interest in reviewing the task progress. Only the resources and other followers can add followers to a task. If a resource assigns the task to another team member, the application automatically changes the original resource to a follower.
What's the difference between my tasks and tasks that I follow?
* You can edit task details and enter progress for your tasks on the Manage Tasks page. If a task has multiple resources, only the primary resource can edit the task.
* When you follow a task, you can view the task details and see the task activity stream. You receive e- mail notifications of changes that team members make to the task.
* If a resource reassigns the task to another team member, then the previous resource automatically becomes a follower.


NEW QUESTION # 33
Your customer wants to see how quantity, cost, and revenue amounts are automatically distributed by using Spread Curve. Identify two period options that are available for this purpose. (Choose two.)

  • A. Accounting Periods
  • B. Calendar Types
  • C. PA Calendar
  • D. PA-GL Periods
  • E. Project Accounting Periods

Answer: A,E

Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic
/TopicId_P_87F467307D50416BE040D30A68816855
Spread curves let you distribute quantity, cost, and revenue amounts automatically across accounting or project accounting periods. You assign a spread curve to each resource class. Planning resources (in the planning resource breakdown structure) inherit the spread curve setting from the associated resource class.
You can change the spread curve for the planning resource and for any corresponding task assignments, or budget or forecast lines.


NEW QUESTION # 34
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes
/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)

  • A. Class categories should be assigned to business unit.
  • B. Class categories should be assigned to project type.
  • C. Class codes should be associated with a related set code.
  • D. Class codes should be assigned to project unit.

Answer: B,C

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation- configuration-manage-project-types.html#OAPFM360164 Topic - Associating Project Types and Class Categories: Examples Project classifications group your projects according to categories and codes that you define. When you associate project classifications with project types, the classification is available for selection on projects with that project type.
Use any of the following methods to associate class categories with project types:
* Add a classification to the project type definition
For each classification that you associate with the project type, you can enable the Assign to All Projects option to automatically add the classification to the project definition for all new projects with the project type. When this option is enabled, all projects with this project type must be assigned a class code for the class category.
* Add a project type to the class category definition
* Enable the Assign to all Project Types option on the class category definition


NEW QUESTION # 35
......