NEW QUESTION 69
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

  • A. MRP Group -> Material Master -> Plant Settings
  • B. Material Master -> Plant Settings -> MRP Group
  • C. Plant Settings -> MRP Group -> Material Master
  • D. Material Master -> MRP Group -> Plant Settings

Answer: D

 

NEW QUESTION 70
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by product costing to determine how costs are rolled up.
  • C. It is used by ATP to determine the priority of alternative components.
  • D. It is used by engineering to identify sub items in an engineering bill of material(BOM).

Answer: A,B

 

NEW QUESTION 71
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.

  • A. Vendor
  • B. Organization
  • C. Customer
  • D. Group
  • E. Person

Answer: B,D,E

 

NEW QUESTION 72
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.

  • A. Material
  • B. Plant
  • C. Work center
  • D. Production version

Answer: A,C

 

NEW QUESTION 73
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Operation network
  • B. Work center hierarchy
  • C. Resource network
  • D. Setup matrix

Answer: B

 

NEW QUESTION 74
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a handling resource in the location master and goods receipt time in the mater all master.
  • B. Model a resource inbound in the location master.
  • C. Model a transportation resource in the location master.
  • D. Model a separate resource inthe production data structure.

Answer: A,C

 

NEW QUESTION 75
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. Alternative resources are fully occupied.
  • B. The work center has several individual capacities.
  • C. The Change Planning Direct on indicator is set.
  • D. The planning strategy is infinite.

Answer: B,D

 

NEW QUESTION 76
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To reduce the number of material masters
  • C. To reduce the number of changes required in bills of material
  • D. To increase the number of planning levels
  • E. Tosimplify the structure of bills of material

Answer: A,C,E

 

NEW QUESTION 77
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.

  • A. Operation control key
  • B. Scheduling margin key
  • C. Confirmation profile
  • D. Production scheduling profile

Answer: A,D

 

NEW QUESTION 78
Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

  • A. MIGO
  • B. MMBE
  • C. MBO2
  • D. MBNL

Answer: A

 

NEW QUESTION 79
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

  • A. Infinite resource and infinite strategy
  • B. Infinite resource and finite strategy
  • C. Finite resource and finite strategy
  • D. Finite resource and infinite strategy

Answer: C

 

NEW QUESTION 80
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.

  • A. Planning time fence
  • B. Goods receipt processing time
  • C. Planned delivery time
  • D. Opening period

Answer: B,D

 

NEW QUESTION 81
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run MRP with quotaarrangement.
  • B. Assign planned orders manual lying the planning table.
  • C. Run MRP with automatic selection of production version.
  • D. Run PP/DS heuristics for repetitive manufacturing.

Answer: A,D

 

NEW QUESTION 82
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Capacity requirements chart
  • B. Orders (dispatched) chart
  • C. Work center capacities chart
  • D. Order (pool) chart

Answer: A,C

 

NEW QUESTION 83
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.

  • A. Material master of the finished product
  • B. Work center, in the production supply area
  • C. BOM, in the item for the material
  • D. Material master of the finished product

Answer: B,C

 

NEW QUESTION 84
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. MRP Controller
  • B. MRP Profile
  • C. MRP Group
  • D. Plant Data

Answer: C

 

NEW QUESTION 85
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question

  • A. Planning file entries
  • B. WIP list
  • C. Operation list
  • D. Production list
  • E. Production overview

Answer: B,C,E

 

NEW QUESTION 86
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Waste products
  • B. Continuous flow materials
  • C. By-products
  • D. Co-products
  • E. Bulk materials

Answer: A,C,D

 

NEW QUESTION 87
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Material requirements planning
  • B. Forecast planning
  • C. Manual planning without check
  • D. Consumption-based planning

Answer: D

 

NEW QUESTION 88
......


SAP C_TS422_2020 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.


 

SAP Certified Application Associate Free Certification Exam Material from Actual4Dumps with 150 Questions: https://pdfpractice.actual4dumps.com/C_TS422_2020-study-material.html